electrical engineering - monitoring system for Transformer's peak load
$10-30 USD
착불
Transformer's peak load during summer. all engineers and technicians are required to go to the site for measuring max peak load during summer season. As you know each group will go to measure the max load in different time which will effect to the loyalty in the work because each area will be different that the other. for example, one area, its transformer will reach to max load at 3:00PM, the other area, its transformer will reach to max load at 4 or 5 o'clock.
other thing, the project will decrease the number of resources by monitoring results from office. no need to send any technician or engineer to check manually.
the project will contain software, with device that will install on the transformer
type of transformers used in our network
- Distribution Transformers (11/0.433kV)
Oil Type Distribution Transformer; Dyn11; ONAN
100 KVA/250KVA/500KVA/1000KVA/1500KVA/2000KVA TRANSFORMERS
Emirates Transformers Co. LLC
Dubai, UAE
Patel Co. LLC
프로젝트 ID: #18498578
프로젝트 소개
이 일자리에 대한 프리랜서 5 명의 평균 입찰가: $30
Hello, happy new year! I have briefly read the description on electrical-engineering-monitoring-system project, and I can deliver as per the requirements however I need us to discuss for more clarity on the det 기타
hi please review my profile & trust me i have complete your work i am ready to your work any time i am waiting for your answer
Hi! Let's discuss your needs in chat. Everything is depends on technology, how to measure load of transformer.