electrical engineering - monitoring system for Transformer's peak load

진행중 등록 시간: 5년 전 착불
진행중 착불

Transformer's peak load during summer. all engineers and technicians are required to go to the site for measuring max peak load during summer season. As you know each group will go to measure the max load in different time which will effect to the loyalty in the work because each area will be different that the other. for example, one area, its transformer will reach to max load at 3:00PM, the other area, its transformer will reach to max load at 4 or 5 o'clock.

other thing, the project will decrease the number of resources by monitoring results from office. no need to send any technician or engineer to check manually.

the project will contain software, with device that will install on the transformer

type of transformers used in our network

- Distribution Transformers (11/0.433kV)

Oil Type Distribution Transformer; Dyn11; ONAN

100 KVA/250KVA/500KVA/1000KVA/1500KVA/2000KVA TRANSFORMERS

Emirates Transformers Co. LLC

Dubai, UAE

Patel Co. LLC

전기 공학 전자 공학 공학 PCB 레이아웃 PLC & SCADA

프로젝트 ID: #18498578

프로젝트 소개

5 건(제안서) 재택 근무형 프로젝트 서비스 이용 중: 5년 전

수상자:

Rsrinu

I am graduate in electrical engineering ( year of graduation 1995) .I am having years of experience with all types of transformer.I am ready to do the job. Relevant Skills and Experience I'm having experience in dist 기타

$20 USD (1일 이내)
(0건의 리뷰)
0.0

이 일자리에 대한 프리랜서 5 명의 평균 입찰가: $30

VirtualBrainInc

Hello, happy new year! I have briefly read the description on electrical-engineering-monitoring-system project, and I can deliver as per the requirements however I need us to discuss for more clarity on the det 기타

$60 USD (1일 이내)
(4 리뷰)
3.8
sharmaanukanesh4

hi please review my profile & trust me i have complete your work i am ready to your work any time i am waiting for your answer

$15 USD (1일 이내)
(0 리뷰)
0.0
mikenru1

Hi! Let's discuss your needs in chat. Everything is depends on technology, how to measure load of transformer.

$30 USD (1일 이내)
(0 리뷰)
0.0