Mesa Substation 500kV Upgrade Project
최소 $50000 USD
착불
The project will primarily consist of:
Upgrade the existing Mesa Substation in Monterey Park from 220 kilovolt (kV) to a 500 kV substation.
Replacement (removal and installation) and modification of transmission lines, subtransmission lines, and distribution structures to accommodate the new Mesa Substation layout.
New telecommunications lines and modifications to an existing line, mostly on existing poles and in existing ducts.
Temporary modifications to 220-kV equipment at several existing substations to prevent electrical outages during construction.
Relocation and replacement of an existing Metropolitan Water District 72-inch-diameter waterline with an 84-inch-diameter waterline through the substation site.
Electrical and/or telecommunications equipment upgrades at 28 existing substations, mostly in other nearby communities.
Close
프로젝트 ID: #18331178
프로젝트 소개
이 일자리에 대한 프리랜서 9 명의 평균 입찰가: $64413
I can provide design services for your substations upgrades and utilities modifications. I can provide layouts for gas insulated switchgear and fluid filled transformers and coordinate design requirements with other en 기타
We are in an era of “Technological Revolution” in each and every aspect of life due to the momentum of change. This growth has modernized the world in the way we think, live, work and interact. To stay ahead in the fas 기타
I'm an senior electrical engineer ,work in the largest consultancy group(shaker) in the middle east in Egypt ,you can ask about this group ,and we do so many projects like this project in the same voltage level and ano 기타