In addition to random power fluctuation, the unpredictable
high ramp rate is another uncertainty of Photovoltaic
(PV) power output. It increases the requirement of both the
amount and response speed of operation reserves at different
time scale in the grid. The fast fluctuation of PV needs to
be compensated by frequent ramp up and down reserves.
Traditional generators will face heavy wear and tear to provide
such support. While energy storage system (ESS) can provide fast
bidirectional power support, ESS’ response time and duration
differs for various technology and material, and are suitable to
provide reserve at different time scale.
프로젝트 ID: #16004452
프로젝트 소개
이 일자리에 대한 프리랜서 7 명의 평균 입찰가: £473
Hi, I am a post graduate power electronics engineer and having very good industrial experience of 8+ years in R&D and project development. I am excellent welding power supplies design, high frequency transformers desi 기타
I'm a Mechanical Engineer college student, i've already fullfilled my first grade graduation and studying for second grade final graduation. My knowledge abount Mechanical Engineering covers : Applied mechanics 기타
Master in Engineering, Electrical and Electronic Engineering undergraduate student, who is dynamic, reliable, resourceful, committed and organized with enthusiastic approach to succeed with a pleasant attitude. Possess 기타
I will do it in 10 day's (AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA)