iii. Execution Phase
1. Production Site NetApp Two-Node cDOT Cluster (HA PAIR)
a) Configure production cluster and verify connectivity
b) Conduct production Cluster Non-Disruptive Operations (NDO) testing
c) Assign node disk ownership and initialize disk spindles
d) Configure cluster interconnect switches (if included)
e) Create NFS exports
f) Rack, stack and cable NetApp controller and shelves
g) Rack, stack and cable cluster interconnect switches (if included)
h) Create and configure new cDOT cluster
i) Create and configure one (1) SVM (Storage Virtual Machine) to be used for
CIFS/NFS
j) Create and configure one (1) SVM (Storage Virtual Machine) to be used for
FC/iSCSI
k) 7MTT Discovery and Planning
2. DR / Secondary Site NetApp Two Node cDOT Cluster (HA Pair)
a) Configure DR cluster and verify connectivity
b) Assign node disk ownership and initialize disk spindles
c) Create one (1) NFS export and attach to up to three (3) VMware hosts
d) Configure cluster interconnect switches (if included)
e) Rack, stack, and cable cluster interconnect switches (if included)
f) Rack, stack, and cable NetApp controller and shelves
g) Create and configure new cDOT cluster
h) Create and configure one SVM (Storage Virtual Machine)
i) Conduct DR cluster Non-Disruptive Operations (NDO) testing
3. Data Replication Configuration
a) Create cDOT cluster peering relationship between production & DR site clusters
b) Create (1) test and up to (3) Volume SnapMirror (VSM) replication relationships
c) Test (1) Volume SnapMirror replication failover and failback
4. NetApp Software
a) Install and configure NetApp VSC and VAAI plug ins for up to (3) vSphere hosts
b) Install and configure OnCommand Unified Manager & Performance Manager,
or add cluster to existing instances
5. NetApp Clustered ONTAP – 7-Mode Transition Tool Installation
a) Install and configure 7-Mode Transition Tool (7MTT) on a dedicated VM
b) 7-mode transition tool error and warnings review and testing
c) 7MTT discovery and review of HA pairs
d) Transition up to 10TB of data from existing "Prod" 7-Mode cluster to new CDOT
cluster – T&M task
e) Transition up to 10TB of data from existing "DR" 7-Mode cluster to new CDOT
cluster – T&M task
iv. Project Closeout Phase
1. Create As-Built documentation describing the deployment and provide to the
Customer
2. Conduct a knowledge transfer session not to exceed five (5) hours in duration
we will deliver a single knowledge transfer session, limited to five (5) hours, to
describe the configuration changes. The session will not be a substitute for formal
classroom training. The appropriate customer staff will be available for the session,
as subsequent knowledge transfer sessions will be billed as a change request
3. Deliver Customer acknowledgement and obtain signoff.
Hi, I have read your description carefully.
I have enough experience of C#/.Net for 15 years.
Also I have experience of making Windows Application.
I introduce the benefits in working with our team
- We are following a defined approach and have a strong project management methodology on the desktop application development.
- We are in continuous communication with the client from start to end.
- The Project development is carried out in phases
- Regular updates are provided on completion of every phase
- A complete transparency is maintained between the development team and the client throughout the project development.