필터

내 최근 검색 기록
필터링 기준:
예산
최대
최대
최대
타이프하기
기술
언어
    프로젝트 진행 단계
    2 건 검색 완료, 금액 기준 - USD

    I require: 1- preliminary Primavera "P6" Schedule (only preliminary based on the attached bill of quantities) 2- Organzational chart (attached but needs to be re-done in presentable way) 3- Outline HS&E plan (standard for construction projects) 4- QA/QC credentials. (standard for construction projects) Should be easy job as the required schedule is preliminary not full details, othe...

    $90 (Avg Bid)
    $90 평균 입찰가
    8 입찰

    Working on building 2 x SS Tank Installation onsite, need a detail schedule with resource allocation. With complete scope breakdown, I have done one is excel for one tank, and got some sample schedule, need to develop similar in details.

    $102 (Avg Bid)
    $102 평균 입찰가
    23 입찰